ID 444806 - Switching between sequences with the same name, in a Sync Review session, does not correctly update the Timeline and Viewer for the Client machine

Follow

Problem summary
Switching between sequences with the same name, in a Sync Review session, does not correctly update the Timeline and Viewer for the Client machine.

Customer reported version
Nuke Studio 12.2v1

Customer reported platform
N/A

Steps to reproduce

1) Open Nuke Studio and load multiple projects (it seems to be easier to reproduce with at least 3 projects), each containing a sequence. 

This has also been reproduced by importing an XML sequence into multiple new Projects. 

You need to also ensure that the Sequences have the same names (ie. Sequence 1).


2) Change your Workspace to Sync Review (beta) and press Host to start a Sync Review session.

3) Open a second Nuke Studio session.

4) Change your Workspace to Sync Review (beta) and press connect to join the Sync Review session. You can use the hostname "localhost" to connect to the other session on the same machine.

Result: The projects are not synced and switching between sequences does not update correctly the Viewer/Timeline for the Client session.

Expected behaviour
All open projects should be synced between the Host and Client sessions. 

Actual behaviour
Switching between sequences with the same name, in a Sync Review session, does not correctly update the Timeline and Viewer for the Client machine.

Workaround
Disconnecting from the Sync Review session and reconnecting may help refresh the Client session.

Reproduced by support
Nuke Studio 12.2v1 - Windows 10 - macOS 10.13 (High Sierra) - Linux CentOS 7 

NOTE: This issue does appear to be more prevalent on Windows.

Earliest version tested
Nuke Studio 12.2v1 